10’’ & 12’’
Production Line Replacement at AENR Agbara Platform
10’’ & 12’’
Production Line Replacement at AENR Agbara Platform
Delivery of 10’’ Sch.
80 & 12’’ Sch. 40 Pipes at Agbara Platform
Delivery of 10’’ Sch.
80 & 12’’ Sch. 40 Pipes at Agbara Platform
Fabrication of Pipes,
Flanges and Elbows
Fabrication of Pipes,
Flanges and Elbows
Fabrication of Pipes,
Flanges and Elbows
Fabrication of Pipes,
Flanges and Elbows
Installation of Pipes
Alongside Existing Pipes
Installation of Pipes
Alongside Existing Pipes
Installation of Pipes
Alongside Existing Pipes
HP/LP
SEPERATOR BYE-PASS NAOC FLOW STATION -OSHIE
CUT OUT
SECTION OF 12INCH LINE OF HP//LP SEPERATOR
INSTALLATION
OF 12 INCH BALL VALVE ON 12 INCH LINE
INSTALLED
12’’ X 6’’ TEE
INSTALLED
12 X 6 TEE REDUCED TO 4 ‚ BALL VALVE AND LINE
PILLING
18” COATED PIPES, INSTALLATION OF BEAMS AND GRATING AT NAOC
OBAMA FLOW PLATFORM
Sheet
Piling for shore line protection at Naoc Brass Terminal
Sheet
Piling for shore line protection at Naoc Brass Terminal
STRUCTURAL
REPAIR PHASE II AT NAOC CLOUGH CREEK FLOW
REHABILITATION
OF MITSU BOILER ON BOARD FPSO MYSTRAS (NPDC)
CORROSION
CONTROL AT AENR AGBARA PLAT FORM
CONSTRUCTION
OF 20,000 BARREL CAPACITY TANK NAOC OGBIENBIRI FLOWSTATION
CONSTRUCTION
OF 1.2KM CONCRETE ROAD AT SEPLAT AMUKPE FACILITY
SHUT
DOWN PROCESS OF FPSO MYSTRAS- WATER OUTLET SPOOLS CHANGE OUT,
MECHANICAL CLEANING OF ASSOCIATED PIPING, DE-SANDING-CLEANING
OF 5NO PRESSURE VESSELS
NPDC
OML 111 EPF debottlenecking and Enhancement Project
Oredo
Ongoing
Work at NDDC safe house, Old GRA, Port Harcourt